The soil stack must carry gases from inside out and the hvac unit must either transfer inside air out or outside air in or both.
Penetrate roof for remote condenser.
When penetration is unavoidable in the case of hvac and plumbing vents the roof membrane is penetrated so the first rule doesn t apply.
Iecc 2015 2018 astm 2178 13 air permanence.
Item r 9725 3p r 9725 3p 12 volt remote mount condenser with dual fans.
Item 77r0620 rd 4 4738 0p replacement condenser core for r 6100 and r 610 units.
Icc 500 2014 fema p 361 wind rated.
Typically that part of the system is located outside the building usually on the roof though it can also be placed in an interior plant room.
The developer contracted a structural engineer to design a frame to attach directly to the dunnage steel frame.
1003 0 mm 16 8 in.
I ve got a contractor friend that i m helping and he wants to put the condensers on the roof and i m wondering if there are any good ways to do the penetration for the lineset electric etc and have it weather tight.
R 6160 0 24p 24 volt roof mount condenser unit.
The top of the curb should be level after installation.
Space was very tight and the structural support for the enclosure could not penetrate the roof.
Leed compliant solar reflective index.
When penetration is unavoidable in the case of hvac and plumbing vents the roof membrane is often penetrated.
64 0 mm 21 0 in.
Item r 9720 12p r 9720 12p 12 volt remote mount condenser w inline drier.
Consequently holes in the roof are inescapable.
R 9723 0p 12 volt remote mount condenser with dual fans and inline drier.
425 0 mm rohs compliant.
It s a flat rubber roof.
I m just looking for some basic thoughts ideas.
The condenser and compressor meanwhile are located in a separate unit connected to the box by a pair of lines that transport coolant between the two.
533 0 mm 39 5 in.
Curb criteria for roof mounted equipment 1.
Mounting hardware for junction box and remote condenser depending on local building code sealant for roof penetration if necessary options can be ordered with 50 or 100 copper line set 24 3100 0047 a 4 0 in.
101 6 mm 2 5 in.
The curb and the equipment should be structurally capable of supporting intended loads and should be so designed that no penetration for drains power lines etc will occur through the roof flashing.